I. Preparation before installation


1. Site preparation: Ensure that the installation site is clean and flat, and meets the ventilation, drainage, power supply and other requirements of the equipment. At the same time, ensure the personal safety of the site and the property safety of the equipment.


2. Data preparation: Prepare relevant installation drawings, process requirements, equipment manuals, environmental safety requirements and other materials for reference during the installation process.


3. Personnel preparation: The installation of feed equipment requires professional technicians to operate. Before installation, the technical capabilities and safety of the personnel should be considered to provide guarantees for the installation process.


fish feed 77.jpg


II. Installation process


1. Check the equipment: According to the plan of the equipment, check whether the installation dimensions of each part meet the requirements of the drawing. If there are any discrepancies with the design drawing, they should be repaired in time until the dimensions are confirmed to be correct before installation.


2. Installation of host equipment: First install the host equipment and the rack to ensure that the host equipment is placed firmly and connected tightly to the rack.


3. Connect pipes and electrical equipment: After the installation of the host equipment is completed, install each connecting pipe and electrical equipment one by one according to the installation process sequence requirements. Pay attention to the sealing of the pipe connection and the safety of the electrical equipment.


4. Inspection before commissioning: After the installation is completed, conduct a comprehensive inspection of the entire production line to ensure that the equipment components are firmly connected and not loose, the electrical circuits are correct and not exposed, and the safety protection devices are complete and effective.


255.jpg


III. Debugging process


1. Electrical system debugging: First, debug the electrical system to check whether the working status of electrical components such as motors and electronic control systems is normal. If there are any problems, they should be solved in time to ensure the safe and stable operation of the electrical system.


2. No-load trial run: After the electrical system debugging is completed, no-load trial run is carried out. Start the production line and observe the operation of each equipment, such as abnormal noise, vibration and other phenomena. If any problems are found, they should be stopped in time for inspection and treatment.


3. Load trial run: After the no-load trial run is normal, load trial run is carried out. Gradually increase the amount of raw materials put in and observe the operation of the production line. During the trial run, pay attention to collecting and analyzing production data in order to find out the key factors affecting the production effect. By optimizing production parameters and improving production efficiency, the production line can achieve the best production effect.


4. Debugging summary: After the load trial run is completed, summarize the entire debugging process. Record the problems found in the debugging and the solutions to provide reference for future production. At the same time, evaluate whether the production capacity, product quality and other aspects of the production line meet the requirements, and make necessary adjustments and improvements if necessary.


34.png793456f30690d2e6ffa002d239f6954f.jpg


IV. Precautions


1. Safety first: During the entire installation and commissioning process, always pay attention to safety issues. Comply with relevant safety regulations and operating procedures to ensure personal safety and equipment safety.


2. Technical requirements: Operate in accordance with the technical requirements and installation drawings of the equipment to ensure that the installation dimensions and connection methods of each equipment component meet the requirements.


3. Quality assurance: During the installation and commissioning process, pay attention to quality assurance. Use qualified raw materials and parts to ensure the stability and reliability of the production line.


4. Environmental protection: During the installation and commissioning process, pay attention to environmental protection. Reasonably handle pollutants such as waste and sewage to ensure that production activities meet environmental protection requirements.


The installation and commissioning of the sinking fish feed equipment production line is a complex and important process. By making good preparations in advance, operating according to the installation process, strictly commissioning and paying attention to relevant matters, the safe and stable operation of the production line can be ensured and the ideal production effect can be achieved.